Posts tagged David Palmer-Jones

SITA UK gets West London public partnership contract

SITA UK selected as preferred bidder for West London public private partnership contract

A consortium led by SITA UK, a subsidiary of Suez Environment, has been selected as preferred bidder for a resource recovery contract worth over £900 million over 25 years with the West London Waste Authority.

The contract is to manage up to 300,000 tonnes of residual household waste each year from the West London Boroughs of Brent, Ealing, Harrow, Hillingdon, Hounslow and Richmond-upon-Thames.

The new rail-linked energy-from-waste facility, which will be called the Severnside Energy Recovery Centre (SERC) is set to create new jobs and boost the trades.

The waste collected from over 1.4 million residents will be managed in a new energy-from-waste facility in Severnside, South Gloucestershire and transported by rail from West London.

Compared to the current waste treatment this will save over 83,000 tonnes of CO2 emissions each year, which is more than two million tonnes over the duration of the contract.

This facility will produce enough electricity to power the equivalent of approximately 50,000 homes and could also supply hot water to local businesses, further improving its environmental performance.

The total capital investment in the new facility is over £240 million. A total of 53 permanent jobs will be created at SERC with around 200 jobs being created during its construction.

David Palmer-Jones, Chief Executive Officer of SITA UK, said: “We are delighted to be named preferred bidder for this major waste management contract in West London. It is great news for the six boroughs and their residents, knowing that their waste materials will be used to produce energy and avoid landfill.

“Contracts like this make the circular economy a reality and show that environmentally sustainable solutions offer nothing other than business sense – extracting energy and employment from materials which too often are treated as waste.”

Sita to build £250m Merseyside waste plant

Sita to build £250m Merseyside waste plant

The Merseyside Recycling and Waste Authority has named Sita as preferred bidder for a £1.2 billion deal to manage 430,000 tonnes of waste each year.

The consortium, which consist of industrial energy specialist Sembcorp Utilities UK and I-Environment will build a rail loading waste transfer station in Merseyside and energy-from-waste plant in Teesside.

The winning bid from Sita includes a high efficiency Energy from Waste facility with Combined Heat and Power at the Wilton International site in Teeside creating around 50 new permanent jobs.

New rail hub for the transportation of waste at the existing Potter Group Rail Freight Terminal at Kirkby on Merseyside creating around 25 new permanent jobs.

The new energy-from-waste facility will generate electricity for the equivalent of 63,000 homes and has the potential to provide steam directly to adjacent business customers, which would further improve its efficiency.

In total, over 90 per cent of the contract waste managed by the Sita consortium will be diverted from landfill and used to produce energy.

David Palmer-Jones, Chief Executive Office of Sita UK said: “We are delighted to be selected as preferred bidder for this major contract in Merseyside. This is great news for Merseyside, for the environment and for new jobs.

“The two new facilities that we will develop will enable all of Merseyside’s household waste to be put to good use.

“We will create over 70 new full time jobs in Merseyside and Teeside and several hundred more during the construction of our new resource recovery facilities.”

Go to Top